Timeless Moments, Captured

Timeless Moments, Captured

Location :

Tanjung Langsat, Johor

Client :

Lima Bintang / EEW Malaysia

Date :

May – Sept 2020

Scope Of Work :

Our dedicated team had worked extremely hard to achieve the milestone in the Formosa 2 Offshore Wind Farm project by demonstrating excellence safety performance during the engineered transportation of Pin Piles totaling 69 lengths with individual length measuring 45m to 79m and weighing 257 tonne to 278 tonne.

Location :

Bintulu, Sarawak

Client :

CYNAPEX/PETRONAS LNG

Date :

June 2020

Scope Of Work :

250 Class Barge mounted with 550t DEMAG CC2600 and 100t HITACHI KH500-3 crawler cranes specifically designed as crane vessel performed the dismantling and reinstatement of Marine Loading Arm Z-3303 at MLNG wharf, Bintulu Port. Shifting, Weighing, Loadout and Barge Ballasting for Sabah SHELL’s St. Joseph Redevelopment Project’s Water Injection Topside Module with combined weight 3000 tonnes utilizing AIR-MARINE’s 124 axle-lines Goldhofer Self-Propelled Modular Transporter.

Location :

Kuching, Sarawak

Client :

OCEAN MIGHT SDN BHD

Date :

March 2020

Scope Of Work :

2 units of DEMAG CC3800-1 a 650 tonne and DEMAG CC 2600, a 550 tonne rated capacity crawler cranes performed the tandem lifting and loadout operation of 12 units weighed 450 metric tonnes, 138 metre Long Piles onboard a 350 class flat top barge.

Location :

Kuching, Sarawak

Client :

Ocean Might / Sapura Energy & Mubadala Petroleum

Date :

March 2020

Scope Of Work :

Proudly and successfully executed a complete Loadout of 1,900 tonne PEGAGA WHP Topside offshore structure at Ocean Might fabrication yard in Kuching Sarawak. On this project, AIR-MARINE were responsible the complete turnkey operation i.e. Weighing, loading, engineered transportation etc. The Loadout onto Flattop ballastable barge was completed by utilizing 72axlelines Scheuerle GEN.4 Self-propelled Modular Transporter (SPMT) coupled with 6 Powerpacks.

Location :

Bintulu, Sarawak

Client :

JGC (Malaysia) / KPG Engineering Sdn Bhd

Date :

June 2019

Scope Of Work :

[Project No: 0-7931-2] Heavylifting & transportation for 2 units Mercury Absorber Columns weighing 242 tons for new MRU installation project, Train-9 Malaysia LNG at Tanjung Kidurong, Bintulu, Sarawak

Location :

Bintulu, Sarawak

Client :

Sinohydro Corporation(M)

Date :

May 2019

Scope Of Work :

Transportation and cranelifting of transformer from Bintulu Port to Tanjung Kidurong Combined Cycle Power Plant site at Tanjung Kidurong, Bintulu, Sarawak using SCHEUERLE 24-axleline SPMT and 550-ton Demag CC2600 with superlift.

Location :

Bintulu, Sarawak

Client :

GE Power Solutions (M) / Sinohydro Corporation(M)

Date :

March 2019

Scope Of Work :

Executing tandem lifting, upending and installation of total 10 units 300 mt HRSG modules for the Tanjung Kidurong Combined Cycle Power Plant Phase 2 project at Tanjung Kidurong, Bintulu by utilizing 650 mt Demag CC3800-1 and 550 mt Demag CC2600. The job involves non routine critical lifts under complex operations that require additional safety precaution, detail planning and under competent supervision.

Location :

Kuching, Sarawak

Client :

Oceanmight Sdn Bhd

Date :

August 2018

Scope Of Work :

Shifting of 395Te D28-A Topside by utilising our 24 axlelines of Scheuerle 4th Gen. Self Propelled Modular Trailers (SPMT’s) coupled with 2 units hydraulic Powerpack units from the fabrication area to the quayside. Upon reaching the quay side, the Topside was delivered under our own brand new 650Te Demag CC 3800-1 Crawler crane which was used to lift the topside from the SPMT’s and safely loaded out by placing the topside onto the deck grillage of the DP2 Vessel.

Location :

Kuching, Sarawak

Client :

Oceanmight Sdn Bhd

Date :

August 2018

Scope Of Work :

Shifting of 349Te D28-A Jacket by utilising our 24 axlelines of Scheuerle 4th Gen. Self Propelled Modular Trailers (SPMT’s) coupled with 4 units hydraulic Powerpack units from the fabrication area to the quayside. Upon reaching the quay side, the Jacket was delivered under our own brand new 650Te Demag CC 3800-1 Crawler crane which was used to lift the jacket from the SPMT’s and safely loaded out by placing the jacket onto the deck grillage of the DP2 Vessel.

Location :

Bintulu, Sarawak

Client :

Sarawak Energy

Date :

June 2018

Scope Of Work :

Transportation of Gas Turbine from Bintulu Port to Tanjung Kidurong Combined Cycle Power Plant site at Bintulu, Sarawak using 24 axleline Goldhofer Modular Transporter and installation utilising Modular Skidding Gantry System.

Location :

Tanjung Langsat, Johor

Client :

Lima Bintang / EEW Malaysia

Date :

May – Sept 2020

Scope Of Work :

Our dedicated team had worked extremely hard to achieve the milestone in the Formosa 2 Offshore Wind Farm project by demonstrating excellence safety performance during the engineered transportation of Pin Piles totaling 69 lengths with individual length measuring 45m to 79m and weighing 257 tonne to 278 tonne.

Location :

Bintulu, Sarawak

Client :

CYNAPEX/PETRONAS LNG

Date :

June 2020

Scope Of Work :

250 Class Barge mounted with 550t DEMAG CC2600 and 100t HITACHI KH500-3 crawler cranes specifically designed as crane vessel performed the dismantling and reinstatement of Marine Loading Arm Z-3303 at MLNG wharf, Bintulu Port. Shifting, Weighing, Loadout and Barge Ballasting for Sabah SHELL’s St. Joseph Redevelopment Project’s Water Injection Topside Module with combined weight 3000 tonnes utilizing AIR-MARINE’s 124 axle-lines Goldhofer Self-Propelled Modular Transporter.

Location :

Kuching, Sarawak

Client :

OCEAN MIGHT SDN BHD

Date :

March 2020

Scope Of Work :

2 units of DEMAG CC3800-1 a 650 tonne and DEMAG CC 2600, a 550 tonne rated capacity crawler cranes performed the tandem lifting and loadout operation of 12 units weighed 450 metric tonnes, 138 metre Long Piles onboard a 350 class flat top barge.

Location :

Kuching, Sarawak

Client :

Ocean Might / Sapura Energy & Mubadala Petroleum

Date :

March 2020

Scope Of Work :

Proudly and successfully executed a complete Loadout of 1,900 tonne PEGAGA WHP Topside offshore structure at Ocean Might fabrication yard in Kuching Sarawak. On this project, AIR-MARINE were responsible the complete turnkey operation i.e. Weighing, loading, engineered transportation etc. The Loadout onto Flattop ballastable barge was completed by utilizing 72axlelines Scheuerle GEN.4 Self-propelled Modular Transporter (SPMT) coupled with 6 Powerpacks.

Location :

Bintulu, Sarawak

Client :

JGC (Malaysia) / KPG Engineering Sdn Bhd

Date :

June 2019

Scope Of Work :

[Project No: 0-7931-2] Heavylifting & transportation for 2 units Mercury Absorber Columns weighing 242 tons for new MRU installation project, Train-9 Malaysia LNG at Tanjung Kidurong, Bintulu, Sarawak

Location :

Bintulu, Sarawak

Client :

Sinohydro Corporation(M)

Date :

May 2019

Scope Of Work :

Transportation and cranelifting of transformer from Bintulu Port to Tanjung Kidurong Combined Cycle Power Plant site at Tanjung Kidurong, Bintulu, Sarawak using SCHEUERLE 24-axleline SPMT and 550-ton Demag CC2600 with superlift.

Location :

Bintulu, Sarawak

Client :

GE Power Solutions (M) / Sinohydro Corporation(M)

Date :

March 2019

Scope Of Work :

Executing tandem lifting, upending and installation of total 10 units 300 mt HRSG modules for the Tanjung Kidurong Combined Cycle Power Plant Phase 2 project at Tanjung Kidurong, Bintulu by utilizing 650 mt Demag CC3800-1 and 550 mt Demag CC2600. The job involves non routine critical lifts under complex operations that require additional safety precaution, detail planning and under competent supervision.

Location :

Kuching, Sarawak

Client :

Oceanmight Sdn Bhd

Date :

August 2018

Scope Of Work :

Shifting of 395Te D28-A Topside by utilising our 24 axlelines of Scheuerle 4th Gen. Self Propelled Modular Trailers (SPMT’s) coupled with 2 units hydraulic Powerpack units from the fabrication area to the quayside. Upon reaching the quay side, the Topside was delivered under our own brand new 650Te Demag CC 3800-1 Crawler crane which was used to lift the topside from the SPMT’s and safely loaded out by placing the topside onto the deck grillage of the DP2 Vessel.

Location :

Kuching, Sarawak

Client :

Oceanmight Sdn Bhd

Date :

August 2018

Scope Of Work :

Shifting of 349Te D28-A Jacket by utilising our 24 axlelines of Scheuerle 4th Gen. Self Propelled Modular Trailers (SPMT’s) coupled with 4 units hydraulic Powerpack units from the fabrication area to the quayside. Upon reaching the quay side, the Jacket was delivered under our own brand new 650Te Demag CC 3800-1 Crawler crane which was used to lift the jacket from the SPMT’s and safely loaded out by placing the jacket onto the deck grillage of the DP2 Vessel.

Location :

Bintulu, Sarawak

Client :

Sarawak Energy

Date :

June 2018

Scope Of Work :

Transportation of Gas Turbine from Bintulu Port to Tanjung Kidurong Combined Cycle Power Plant site at Bintulu, Sarawak using 24 axleline Goldhofer Modular Transporter and installation utilising Modular Skidding Gantry System.

1 | 2 | 3 

Beyond the Screen, Endless Possibilities

1 | 2 | 3 

Beyond the Screen, Endless Possibilities