Bintulu, Sarawak
OCI Samalaju Plant
2025
Bintulu, Sarawak
OCI Samalaju Plant
2025
Bintulu, Sarawak
OCI Samalaju Plant
2025
Bintulu, Sarawak
SAMSUNG E&A MALAYSIA SDN. BHD
Tanjung Langsat, Johor
Lima Bintang / EEW Malaysia
Bintulu, Sarawak
CYNAPEX/PETRONAS LNG
June 2020
Kuching, Sarawak
OCEAN MIGHT SDN BHD
March 2020
2 units of DEMAG CC3800-1 a 650 tonne and DEMAG CC 2600, a 550 tonne rated capacity crawler cranes performed the tandem lifting and loadout operation of 12 units weighed 450 metric tonnes, 138 metre Long Piles onboard a 350 class flat top barge.
Kuching, Sarawak
Ocean Might / Sapura Energy & Mubadala Petroleum
March 2020
Proudly and successfully executed a complete Loadout of 1,900 tonne PEGAGA WHP Topside offshore structure at Ocean Might fabrication yard in Kuching Sarawak. On this project, AIR-MARINE were responsible the complete turnkey operation i.e. Weighing, loading, engineered transportation etc. The Loadout onto Flattop ballastable barge was completed by utilizing 72axlelines Scheuerle GEN.4 Self-propelled Modular Transporter (SPMT) coupled with 6 Powerpacks.
Bintulu, Sarawak
JGC (Malaysia) / KPG Engineering Sdn Bhd
June 2019
Bintulu, Sarawak
Sinohydro Corporation(M)
May 2019
Transportation and cranelifting of transformer from Bintulu Port to Tanjung Kidurong Combined Cycle Power Plant site at Tanjung Kidurong, Bintulu, Sarawak using SCHEUERLE 24-axleline SPMT and 550-ton Demag CC2600 with superlift.
Bintulu, Sarawak
GE Power Solutions (M) / Sinohydro Corporation(M)
March 2019
Executing tandem lifting, upending and installation of total 10 units 300 mt HRSG modules for the Tanjung Kidurong Combined Cycle Power Plant Phase 2 project at Tanjung Kidurong, Bintulu by utilizing 650 mt Demag CC3800-1 and 550 mt Demag CC2600. The job involves non routine critical lifts under complex operations that require additional safety precaution, detail planning and under competent supervision.
Kuching, Sarawak
Oceanmight Sdn Bhd
Kuching, Sarawak
Oceanmight Sdn Bhd
Bintulu, Sarawak
Sarawak Energy
June 2018
Transportation of Gas Turbine from Bintulu Port to Tanjung Kidurong Combined Cycle Power Plant site at Bintulu, Sarawak using 24 axleline Goldhofer Modular Transporter and installation utilising Modular Skidding Gantry System.